Artists impression of the gantry to be installed at the base of the Collins Arch building

Artist's impression of the gantry to be installed at the base of the Collins Arch building.

The Market Street park will be closed during the East Tower works (between Q4 2022 and Q2 2024)

The Collins Street grassed areas will be covered by gantries. These gantries are essential to the facade works on the East Tower. They provide street-level protection and support the base of the mast climbers needed to work on the Collins Arch facade.

When overhead works to the East Tower are complete, the gantries and hoardings will be removed. The park area will be made-good. Some trees within the park will need to be replaced.

Artwork will be used to brighten up hoardings during construction.